User Tools

Site Tools


start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
start [2025/03/12 09:45] – [How does construction vary around the world] gemdevopsstart [2025/03/12 11:05] (current) – [Housing Reports] gemdevops
Line 131: Line 131:
  
 PC -Precast Concrete; RCF - RC Moment Frame; RCW - RC Structural Wall; CM - Confined Masonry; RM - Reinforced Masonry; SM - Stone Masonry; SW - Steel Structural Wall; SMF - Steel Moment Frame; SBF - Steel Braced Frame PC -Precast Concrete; RCF - RC Moment Frame; RCW - RC Structural Wall; CM - Confined Masonry; RM - Reinforced Masonry; SM - Stone Masonry; SW - Steel Structural Wall; SMF - Steel Moment Frame; SBF - Steel Braced Frame
 +
 +© 2025 Earthquake Engineering Research Institute
start.txt · Last modified: 2025/03/12 11:05 by gemdevops

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki